How an ADU Gets Built and What Affects the Cost

Thinking about an ADU on your property? Share the basics and a local contractor will follow up.

An ADU is a small house, with all that implies

An accessory dwelling unit is a second, complete home on a residential lot, with its own place to sleep, cook and bathe. It can stand alone in the backyard, sit inside a converted garage or basement, or attach to the main house. Whatever form it takes, it is built and inspected as a dwelling, so it involves the same trades, permits and decisions as a house, only smaller.

This page walks through the whole path, from the first question of whether your lot can take one to the day someone moves in. We are a referral service. We pass your request to an independent local contractor, who looks at your property, talks through the options and gives you a written estimate. The notes below help you understand what you are asking for.

Contractor reviewing plans beside a staked-out ADU footprint in a backyard.

What decides how an ADU project goes

Five things shape most ADU projects: whether the lot can take one, who does which part of the work, the order of the steps, what drives the budget, and which type of unit suits the property. Sorting these out early saves redesign later.

Starting with feasibility

Before anyone draws a floor plan, the first question is whether your lot can hold the kind of unit you want. Zoning, lot size and shape, the position of the existing house, trees, slopes and where the sewer and water lines run all play a part. Some lots suit a detached unit, others only suit a conversion of space you already have.

A feasibility check answers those questions in rough form so you do not pay for drawings of something that cannot be permitted. Ask whoever does the check which rules they relied on and when they last confirmed them, since ADU rules are revised from time to time.

Who does what

Several people usually touch an ADU. A designer or architect turns your goals into drawings. A structural engineer may be needed for foundations, beams, retaining walls or lateral bracing. The general contractor organizes the build, schedules the trades and is responsible for the work. Electricians, plumbers and mechanical installers handle their systems, and city inspectors check the work at set points.

Some contractors offer design and construction under one agreement, while others build from drawings you bring. Either can work. What matters is knowing who is responsible for each part. In Oregon, contractors are licensed by the Construction Contractors Board, and you can look up a license before you sign.

The path from idea to move-in

Most ADU projects follow the same broad order. Feasibility comes first, then design and drawings, then engineering if the plans call for it. The permit application goes in, the city reviews it and often asks for corrections, and the permit is issued. Only then does construction start.

The build itself runs through site work and foundation, framing, rough plumbing, electrical and mechanical work, insulation, drywall, finishes and fixtures, with inspections between stages. A final inspection closes the permit, and the unit can be occupied once it passes. Ask the contractor which stages tend to take longest for a project like yours and why.

What drives the budget

The type of unit sets the starting point. A new detached building needs a foundation, a full structure and new utility connections. A conversion reuses some of that but may need significant upgrades to bring the space up to code for living in. Size matters, but so does complexity: a kitchen and a bathroom add plumbing and ventilation that a bedroom does not.

Site conditions add their own costs, such as a long sewer run, a sloped lot, poor access for equipment, or trees that need protection. Utility capacity matters too, since an older electrical panel may need an upgrade. Ask each contractor to list these items separately so you can see where the money goes.

Choosing the type of ADU

There are four common types. A detached ADU is a separate building in the yard and offers the most privacy. A garage conversion turns an existing garage into living space. A basement ADU uses space below the main house. An attached ADU is an addition or a carved-out section joined to the house, with its own entrance.

The right choice depends on your lot, what you already have and how the unit will be used: a parent nearby, an adult child, guests, a home office, or a long-term rental. Each type brings different design and construction questions, covered on the pages for each one. A contractor can tell you which types are realistic once they see the property.

Why Request ADU Builder Through Us

One request covers the first conversation

Describe your property and what you want once. We pass it to an independent contractor in the Portland area who contacts you directly.

The estimate is based on your lot

We do not price projects. The contractor looks at your property, your existing structures and your goals before putting anything in writing.

No commitment from sending a request

A request does not obligate you to anything. Any design, estimate or construction agreement is between you and the contractor.

How an ADU project usually unfolds

  1. Site visit and goalsThe contractor looks at the lot, the house, existing structures and utilities, and asks who the unit is for and how it will be used.
  2. Feasibility and typeZoning, lot layout and site conditions are checked to see which ADU types are realistic and roughly what each would involve.
  3. Design, drawings and permitPlans and any engineering are prepared, the permit application is submitted, and review comments are answered until the permit is issued.
  4. Construction and inspectionsThe unit is built in stages, from site work and foundation to finishes, with city inspections at each required point.
  5. Final inspection and move-inThe final inspection closes the permit, you walk the unit with the contractor, and the space is ready for its first occupant.

ADU Builder Questions

Which type of ADU usually costs least to build?

Converting space you already have, such as a garage or basement, often avoids a new foundation and roof. But it depends on condition. A garage with a weak slab or a damp basement can need enough work to close the gap. A contractor can compare the options on your property.

Do I need a designer before I contact a contractor?

Not necessarily. Some contractors handle design and permitting as part of their service, and others work from drawings you provide. Talking to a contractor early can help you understand what your lot allows before you commit to a design.

Can an ADU be rented out?

Many homeowners build an ADU with a rental in mind, but rules on renting, owner occupancy and short-term rentals vary and change. Confirm the current rules for your address with the city and get your own advice before counting on any rental use.

Why can't you tell me what an ADU will cost?

We are a referral service and do not price work. ADU costs depend on the type, size, site, utilities and finishes, so the independent contractor needs to see your property and understand your plans before writing an estimate.

Call for a Free Estimate

Tell us about your lot and the kind of unit you have in mind. We will pass your request to an independent local contractor who will contact you.

Call (503) 918-8254