Home / Services

Portland and nearby communities

Detached ADU in Portland, OR

Tell us about your backyard and a local contractor will follow up.

A second house in the backyard

A detached ADU is a freestanding building on the same lot as the main house, sometimes called a backyard cottage. It offers the most separation of any ADU type, with its own walls, roof and entrance, and no shared floors or ceilings. That privacy comes with more construction, because everything from the foundation to the utility connections is new.

This page covers the questions that are specific to building new in the yard: where the unit can go, what it sits on, how water, sewer and power reach it, and how the crew gets materials in. We are a referral service. We pass your request to an independent local contractor, who visits the property and gives you the estimate.

Backyard ADU being framed, with a framer on a ladder and tools on the slab.

What a backyard unit has to solve

Five questions come up on almost every detached ADU. Several depend on things you cannot see from the patio, such as the depth of the sewer line or the root zones of trees, so expect the contractor to look closely before suggesting a location.

Siting, setbacks and trees

Where the unit can sit is limited by setbacks from property lines, distance from the main house, height rules and lot coverage. Trees matter a great deal in Portland, where tree rules can protect certain trees and the soil around their roots. A spot that looks open may sit over the roots of a large tree next door.

These rules change and depend on your zone, so confirm the current requirements with Portland Permitting & Development before settling on a location. Ask the contractor or designer to sketch the possible footprints on a site plan, showing setbacks, trees and the existing house, so you can compare options on paper first.

The foundation

Every detached unit needs a foundation sized for the building and the soil. Common options are a concrete slab on grade or a perimeter foundation with a crawlspace. A slab keeps the floor close to the ground and can suit a step-free entry. A crawlspace leaves room beneath the floor for plumbing and ductwork and can work better on a sloped lot.

Soil, slope, drainage and nearby tree roots all affect the choice, and a structural engineer may be involved. Ask how the foundation will handle water around the building and whether any excavation could reach tree roots or buried lines.

Utility runs from the house or the street

A backyard unit needs water, sewer and power, and each can usually come from the main house or from a separate connection. Running lines from the house is often simpler, but the sewer line has to slope downhill all the way, so the depth and location of the existing sewer decides a lot. Some lots need a pump if gravity will not work.

Power may come from the main panel, which can push an older panel past its capacity, or from a separate service. Gas, if wanted, adds another line. Ask the contractor to trace each utility route on the site plan and say what the trenching will cross.

Access for construction

Getting materials and equipment into a backyard is its own puzzle. A narrow side yard, a fence, a steep driveway or a garden in the way can mean smaller equipment, more hand work and more time. Concrete may need to be pumped over the house. Lumber may be carried in rather than set down by a truck.

Talk early about what will be disturbed and restored: lawn, fencing, paths or plantings. Ask where materials will be staged, how the neighbors' access will be kept clear, and whether any part of the yard should be protected during the build.

Prefab or site-built

A detached unit can be built on site from the ground up, or built partly or wholly in a factory and delivered. Prefab and modular units can shorten time on site, but they still need a foundation, utility connections, a permit and inspections. Delivery needs a clear path for a truck or crane, which some lots do not have.

Site-built units offer more freedom to fit an unusual lot or match the main house. Neither approach is right for every property. If you are considering prefab, ask the contractor what they would still need to do on site, and who is responsible for which parts.

Why Request Detached ADU Through Us

The lot is looked at in person

Trees, slopes, sewer depth and access cannot be judged from an aerial photo. The contractor we refer you to visits before proposing a location.

A contractor who works in the area

Your request goes to an independent contractor serving Portland and nearby communities who is familiar with local permit offices.

You decide what happens next

We pass your request along and step back. The plan, the estimate and any agreement are settled between you and the contractor.

From an empty yard to a finished unit

  1. Walk the lotThe contractor looks at open space, trees, slope, access and where the existing utilities run, and discusses possible locations.
  2. Site plan and designA site plan shows the footprint, setbacks, trees and utility routes, and the building itself is designed to fit.
  3. Permit and preparationThe permit is applied for and issued, tree protection is set up where required, and the site is cleared and staked.
  4. Foundation, utilities and shellTrenches are dug for utilities, the foundation is poured, and the frame, roof, windows and siding go up with inspections along the way.
  5. Systems, finishes and finalPlumbing, wiring, heating, insulation and finishes are completed, the yard is restored, and the final inspection closes the permit.

Detached ADU Questions

Can a detached ADU share utilities with my house?

Often yes, but it depends on the sewer depth and slope, the capacity of your electrical panel and the length of the runs. Sometimes a separate connection is required or simply works better. Ask the contractor to confirm with the city and the utilities for your address.

Will a big tree in my yard stop a detached ADU?

Not always, but it can limit where the unit goes and how the foundation is built. Portland has rules that can protect trees and their roots. Have the trees identified on the site plan early and confirm the current requirements with the city.

Is a prefab ADU faster than building on site?

Factory construction can shorten time in the yard, but site work, the foundation, utility connections, permitting and inspections still happen locally. Delivery access also matters. Ask the contractor to compare both approaches for your lot.

How close to the property line can a detached ADU be?

That depends on your zone and on current rules, which change from time to time. We do not state setback figures. Confirm the requirements for your lot with Portland Permitting & Development or have your contractor or designer check them.

Call for a Free Estimate

Describe your yard, its access and any large trees. We will pass your request to an independent local contractor who will contact you.

Call (503) 918-8254