FAQ

ADU Builder Questions and Answers

What permits does an ADU need in Portland?

An ADU is a separate dwelling, so it needs a building permit and usually related trade permits for plumbing, electrical and mechanical work. In the City of Portland these are handled by Portland Permitting & Development. Size limits, placement rules and fee waivers have changed over time, so confirm the current rules with the city before your design is final.

What is the usual sequence of an ADU project, and what affects how long it takes?

Most projects move from site visit and design to permit review, then site work, foundation, framing, utilities, insulation, finishes and final inspection. Duration depends on how many plan review questions come back, the type of unit, utility work, weather during the wet season, material lead times and how quickly you make decisions on finishes.

How is moisture and mold handled in a Portland ADU?

Portland's long wet season makes moisture control central. Ask the contractor how they keep framing and materials dry during construction, how roof water and ground drainage are handled, and how the unit will be ventilated. In a basement ADU, damp walls or floors should be addressed before any finishes go in, or mold can develop later.

How do I verify an ADU contractor in Oregon?

Look the contractor up on the Oregon Construction Contractors Board search. Confirm the license is active, the business name matches the estimate, and check for complaints or claims. The CCB record also lists bond and insurance details. Ask for proof of insurance directly as well, and do this before you sign a contract or pay a deposit.

What materials hold up best for an ADU in Portland's climate?

Siding, roofing and windows should be chosen for steady rain and damp air. Durable siding with a proper rain screen, well-flashed windows and a roof with good overhangs help the building shed water. Inside, moisture-resistant materials in the bathroom and kitchen and hard flooring at entries tend to last. The contractor can explain options that fit your budget.

What should I have ready before the contractor visits?

Have a rough idea of who will live in the ADU and how you will use it, plus any ideas for size or type. If you have a property survey, house plans, or notes on past sewer, electrical or foundation work, set those out. Know where your trees, garage, side yard access and utility lines are, and note any questions.

Is there a best time of year to start an ADU in Portland?

Design and permit review can happen in any season, so many homeowners start planning in the fall or winter. Site work and foundation are easier in drier months, and getting the building closed in before heavy rain helps. Contractors' schedules also fill up, so starting the conversation early gives you more choice about when construction begins.

Who provides the estimate, contract and warranty?

The independent contractor does. ADU Builder Portland passes your request along, and the contractor visits, prepares the estimate and writes the contract. The scope, price, payment schedule, change process and any warranty are all set by the contractor in their agreement with you. Read it carefully and ask about anything that is not clear before you sign.

Call for a Free Estimate

Send a short description of your lot, your house and who the ADU is for, and we will pass it to an independent local contractor.

Call (503) 918-8254