ADU Design and Permitting in Portland, OR
Want help sorting out what your lot allows? A local contractor can follow up.
Most ADU decisions happen on paper first
Before any ground is broken, an ADU goes through feasibility, design, engineering and permit review. This stage decides what you are allowed to build, where it can go and how it will be built. Mistakes here are cheap to fix. The same mistakes found after construction starts are not. Taking the paper side seriously is the best protection for your budget.
This page explains what happens in design and permitting and what to ask along the way. ADU rules change, so confirm current requirements with Portland Permitting & Development, or with the city that covers your address. We are a referral service. We pass your request to an independent local contractor, who can explain how they handle this stage.

The steps between an idea and a permit
Five pieces make up the design and permitting stage. Some contractors handle all of them, some partner with a designer, and some expect you to arrive with drawings. Knowing what each step involves helps you understand who is doing what.
Feasibility and zoning questions
The first step is to find out what your lot allows. Zoning sets things like how many units are allowed, how large they can be, how far from property lines, how tall, and how much of the lot can be covered. Your lot may also have easements, trees with protections, slopes, overlay zones or a historic designation that add rules.
These rules change from time to time and are specific to each address. Rather than relying on what a neighbor did, ask the city or have your designer confirm the current requirements for your lot. Write down the answers, who gave them and when, so you can refer back.
Drawings and design
Permit drawings usually include a site plan, floor plans, elevations, sections and construction details. They show where the unit sits, how it is laid out, how it is framed and how it meets energy and safety requirements. The quality of these drawings affects how smoothly review goes.
Design is also where you make the choices that matter for daily life: how light comes in, where the kitchen sits, how private the entrance feels, and whether the unit works for someone with limited mobility. Ask who will produce the drawings, how many rounds of changes are included, and who owns them.
Structural engineering
Many ADU projects need a structural engineer. Foundations, beams over wide openings, retaining walls, cuts in basement walls, roof tie-ins on additions and bracing against wind and earthquakes may all need calculations and stamped details. The engineer's work becomes part of the permit set.
Not every project needs the same level of engineering, and the city decides what it requires. Ask early whether engineering is likely for your project and who will hire the engineer. Waiting until the city asks for it during review can add delay, and late changes to the structure can ripple through the rest of the drawings.
Permit submittal, corrections and inspections
Once drawings are ready, the permit application goes to the city with the required documents and fees. Reviewers check the plans against zoning, building, energy and other codes, and they often send back correction requests. Each correction needs a clear answer, sometimes revised drawings.
After the permit is issued, inspections happen during construction at set stages, such as foundation, framing, plumbing, electrical, insulation and final. Work cannot be covered up until it passes. Ask who will respond to correction requests, who schedules inspections, and how failed inspections are handled. No one can promise a permit will be approved.
Utility, address and fee questions
An ADU raises practical questions beyond the building itself. Will water and sewer connect through the main house or separately? Does the electrical service have capacity? Are there system development charges or utility fees, and when are they due? Does the unit need its own address for mail and emergency services?
The answers depend on the city, the utility providers and current policies, which change. Some fees or incentives may apply in certain cases. Ask the city and utilities directly about your address, and ask the contractor or designer which of these they will handle and which you will need to follow up on.
Why Request ADU Design and Permitting Through Us
Ask about the paper side up front
Some contractors handle design and permits and some do not. The contractor we refer you to can explain how they approach this stage.
Local permit offices
Your request goes to an independent contractor working in Portland and nearby communities who deals with local permit offices.
No commitment to build
A request does not commit you to anything. Any design or construction agreement is between you and the contractor.
How design and permitting usually runs
- Confirm what the lot allowsZoning, lot features and current ADU rules for your address are checked with the city or by your designer.
- Design the unitA layout is developed and refined, then turned into a full set of permit drawings with site plan and details.
- Add engineeringA structural engineer reviews the design and provides calculations and details where the city or the design requires them.
- Submit and answer correctionsThe application is filed, reviewers send comments, and revised drawings or answers are provided until the permit is issued.
- Inspect through to finalInspections are scheduled at each required stage during construction, ending with a final inspection that closes the permit.
ADU Design and Permitting Questions
Who applies for the ADU permit?
It varies. A contractor, a designer or the homeowner can apply, depending on the arrangement and the city's rules. Agree in writing who submits the application, who answers corrections and whose name is on the permit before design starts.
How long does ADU permit review take?
We do not give timelines because review times change with the city's workload and the completeness of the application. Ask the city for current guidance, and ask your contractor or designer what their recent experience has been.
Are there fees or incentives for ADUs in Portland?
There may be permit fees, system development charges and utility costs, and some programs may reduce or waive certain fees. These change, so confirm what currently applies to your address with Portland Permitting & Development and your utilities.
What is a correction request?
It is a list of questions or required changes from the plan reviewers after they read your application. Each item needs a clear answer or revised drawing. Complete, well-prepared drawings tend to receive fewer corrections.